Building on the Practice experience with Development Control Plans the client required a full survey / space utilisation of all buildings on the Dewsbury & District Hospital site.
The primary tasks involved:
• Check building layout plans and departments
• Check staffing levels
• Check spare capacity / non used areas
• Check all fire doors and compartmentation
• Identify space for reutilisation from other areas within the Trust
• Check functional suitability / assessment
• Apply Estate Code Classification / consideration of 6 Facet Survey
• Include all HUB locations and relevant infrastructure services.
• Consider what repairs or replacement are required regarding FD60 fire doors following detailed survey
• Re-drawing fire strategy from information supplied by the Trust into AutoCAD format
• All buildings / site to be updated as a current record with presentation drawings highlighting function and spatial staffing level
Additional survey work was also required of other Trust properties beyond the site, totalling 13 no. properties total.
ClientThe Mid Yorkshire Hospitals NHS TrustValueN/ACompleted2012